Biomass Power Plants in North Dakota
Every operating biomass power plant in North Dakota as of 2026-07: 1 plants, 2 generating units and 10 MW of nameplate capacity across 1 county, most of it inside MISO.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 2 generating units
- Nameplate capacity
- 10 MW
- Counties
- 1
- Grid operator
- MISO
- covers most of these plants
Map of biomass power plants in North Dakota
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Biomass · 1
List of biomass power plants in North Dakota
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| EnderlinOther Waste Biomass | Archer Daniels Midland Co | Ransom | 9.8 | 2 | 1983 | Standby/Backup |
|---|
Largest biomass power plants in North Dakota
- 1EnderlinRansom County, North Dakota9.8 MW
Biomass power plants by county in North Dakota
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Ransom | 1 | 9.8 |
Biomass Power Plants in North Dakota: FAQ
- How many biomass power plants are in North Dakota?
- 1, with 10 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of North Dakota biomass power plants?
- Yes — the map above. Each dot is one biomass power plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest biomass power plant in North Dakota?
- Enderlin, at 10 MW. The table is sorted largest first, so the rest follow it.
- Is there a biomass power plant near me in North Dakota?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs North Dakota's biomass power plants?
- Most of them sit inside MISO, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Wood and wood waste, landfill gas, municipal solid waste and other waste biomass. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.