Biomass Power Plants in North Dakota

Every operating biomass power plant in North Dakota as of 2026-07: 1 plants, 2 generating units and 10 MW of nameplate capacity across 1 county, most of it inside MISO.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
2 generating units
Nameplate capacity
10 MW
Counties
1
Grid operator
MISO
covers most of these plants

Map of biomass power plants in North Dakota

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Biomass · 1

List of biomass power plants in North Dakota

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

biomass power plants in North Dakota
EnderlinOther Waste BiomassArcher Daniels Midland CoRansom9.821983Standby/Backup

Largest biomass power plants in North Dakota

  1. 1EnderlinRansom County, North Dakota9.8 MW

Biomass power plants by county in North Dakota

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Ransom19.8

Biomass Power Plants in North Dakota: FAQ

How many biomass power plants are in North Dakota?
1, with 10 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of North Dakota biomass power plants?
Yes — the map above. Each dot is one biomass power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest biomass power plant in North Dakota?
Enderlin, at 10 MW. The table is sorted largest first, so the rest follow it.
Is there a biomass power plant near me in North Dakota?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs North Dakota's biomass power plants?
Most of them sit inside MISO, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Wood and wood waste, landfill gas, municipal solid waste and other waste biomass. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.