Biomass Power Plants in Ohio

Every operating biomass power plant in Ohio on EIA-860M for 2026-07: 13 plants, 41 generating units and 140 MW of nameplate capacity across 12 counties, most of it inside PJM.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
13
41 generating units
Nameplate capacity
140 MW
Counties
12
Grid operator
PJM
covers most of these plants

Map of biomass power plants in Ohio

Every one of the 13 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Biomass · 13

List of biomass power plants in Ohio

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

biomass power plants in Ohio
Pixelle Specialty Solutions LLC - Chilli2 technologiesUS Paper Mill CompanyRoss92.841952Operating
Bay View Cogeneration FacilityLandfill GasCOT/Division of Water ReclamationLucas1222010Out of service and NOT expected to return to service in next calendar year
Suburban Landfill Gas RecoveryLandfill GasWM Renewable Energy LLCPerry5.672011Operating
Brown County LFGTE Power StationLandfill GasEnergy Developments, Inc d/b/a EDLBrown4.832017Operating
GenevaLandfill GasWM Renewable Energy LLCAshtabula452013Operating
MahoningLandfill GasWM Renewable Energy LLCMahoning452013Operating
Energy Developments, HancockLandfill GasEnergy Developments, Inc d/b/a EDLHancock3.242014Operating
Cuyahoga Generating FacilityLandfill GasNortheastern Power SystemsCuyahoga3.212025Operating
Napoleon BiogasOther Waste BiomassCH4 Biogas LLCHenry2.822013Out of service and NOT expected to return to service in next calendar year
Jackson Pike WWTP Cogen EnginesOther Waste BiomassCity of Columbus - (OH)Franklin2.822026Operating
North American - Erie Generating StationLandfill GasNorth American -- Erie, LLCErie2.422010Operating
Akron WRFOther Waste BiomassCity of Akron - (OH)Summit1.832014Operating
Collinwood BioEnergy FacilityOther Waste BiomassCollinwood BioEnergyCuyahoga112011Operating

Largest biomass power plants in Ohio

  1. 1Pixelle Specialty Solutions LLC - ChilliRoss County, Ohio92.8 MW
  2. 2Bay View Cogeneration FacilityLucas County, Ohio12 MW
  3. 3Suburban Landfill Gas RecoveryPerry County, Ohio5.6 MW
  4. 4Brown County LFGTE Power StationBrown County, Ohio4.8 MW
  5. 5GenevaAshtabula County, Ohio4 MW
  6. 6MahoningMahoning County, Ohio4 MW
  7. 7Energy Developments, HancockHancock County, Ohio3.2 MW
  8. 8Cuyahoga Generating FacilityCuyahoga County, Ohio3.2 MW
  9. 9Napoleon BiogasHenry County, Ohio2.8 MW
  10. 10Jackson Pike WWTP Cogen EnginesFranklin County, Ohio2.8 MW

Biomass power plants by county in Ohio

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Ross192.8
Lucas112
Perry15.6
Brown14.8
Cuyahoga24.2
Ashtabula14
Mahoning14
Hancock13.2
Franklin12.8
Henry12.8
Erie12.4
Summit11.8

Biomass Power Plants in Ohio: FAQ

How many biomass power plants are in Ohio?
13, with 140 MW of nameplate capacity between them, spread over 12 counties. That is the EIA-860M operating count for 2026-07.
Is there a map of Ohio biomass power plants?
Yes — the map above. Each dot is one biomass power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest biomass power plant in Ohio?
Pixelle Specialty Solutions LLC - Chilli, at 93 MW. The table is sorted largest first, so the rest follow it.
Is there a biomass power plant near me in Ohio?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Ohio's biomass power plants?
Most of them sit inside PJM, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
How current is this, and what is left out?
EIA-860M for 2026-07. Wood and wood waste, landfill gas, municipal solid waste and other waste biomass. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.