Biomass Power Plants in South Dakota
Every operating biomass power plant in South Dakota on EIA-860M for 2026-07: 1 plants, 1 generating units and 5 MW of nameplate capacity across 1 county, most of it inside MISO.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 1 generating units
- Nameplate capacity
- 5 MW
- Counties
- 1
- Grid operator
- MISO
- covers most of these plants
Map of biomass power plants in South Dakota
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Biomass · 1
List of biomass power plants in South Dakota
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| POET Biorefining - ChancellorWood/Wood Waste Biomass | POET Biorefining- Chancellor | Turner | 5.4 | 1 | 2018 | Operating |
Largest biomass power plants in South Dakota
- 1POET Biorefining - ChancellorTurner County, South Dakota5.4 MW
Biomass power plants by county in South Dakota
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Turner | 1 | 5.4 |
Biomass Power Plants in South Dakota: FAQ
- How many biomass power plants are in South Dakota?
- 1, with 5 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of South Dakota biomass power plants?
- Yes — the map above. Each dot is one biomass power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest biomass power plant in South Dakota?
- POET Biorefining - Chancellor, at 5 MW. The table is sorted largest first, so the rest follow it.
- Is there a biomass power plant near me in South Dakota?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs South Dakota's biomass power plants?
- Most of them sit inside MISO, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Wood and wood waste, landfill gas, municipal solid waste and other waste biomass. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.