Every operating biomass power plant in Washington on EIA-860M for 2026-07: 13 plants, 39 generating units and 291 MW of nameplate capacity across 10 counties.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
13
39 generating units
Nameplate capacity
291 MW
Counties
10
Grid operator
Mixed
no single ISO covers a majority

Map of biomass power plants in Washington

Every one of the 13 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Biomass · 13

List of biomass power plants in Washington

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

biomass power plants in Washington
Nippon Dynawave Packaging Longview WAWood/Wood Waste BiomassNippon Dynawave Packaging Co.Cowlitz62.441948Operating
Kettle Falls Generating Station2 technologiesAvista CorpStevens57.921983Operating
Longview FibreWood/Wood Waste BiomassLongview Fibre CoCowlitz4521958Operating
Sierra Pacific Burlington FacilityWood/Wood Waste BiomassSierra Pacific IndustriesSkagit2812007Operating
Spokane Waste to EnergyMunicipal Solid WasteCity of Spokane - (WA)Spokane2611991Operating
Sierra Pacific AberdeenWood/Wood Waste BiomassSierra Pacific IndustriesGrays Harbor1812003Operating
Cosmo Specialty Fibers PlantWood/Wood Waste BiomassCosmo Specialty FibersGrays Harbor1521957Out of service but expected to return to service in next calendar year
McKinley Paper Co. - Washington MillWood/Wood Waste BiomassMcKinley Paper Co. - Washington MillClallam12.612022Out of service but expected to return to service in next calendar year
Port Townsend PaperWood/Wood Waste BiomassPort Townsend Paper CoJefferson7.511986Operating
Cedar HillsLandfill GasKing County Solid Waste DivisionKing5.4182009Operating
West Point Treatment PlantOther Waste BiomassKing County Dept-Natural Res - (WA)King4.622012Operating
DarringtonWood/Wood Waste BiomassHampton Lumber Mills - Washington IncSnohomish4.512007Operating
LRI LFGTE FacilityLandfill GasFrontier Operation ServicesPierce4.532013Operating

Largest biomass power plants in Washington

  1. 1Nippon Dynawave Packaging Longview WACowlitz County, Washington62.4 MW
  2. 2Kettle Falls Generating StationStevens County, Washington57.9 MW
  3. 3Longview FibreCowlitz County, Washington45 MW
  4. 4Sierra Pacific Burlington FacilitySkagit County, Washington28 MW
  5. 5Spokane Waste to EnergySpokane County, Washington26 MW
  6. 6Sierra Pacific AberdeenGrays Harbor County, Washington18 MW
  7. 7Cosmo Specialty Fibers PlantGrays Harbor County, Washington15 MW
  8. 8McKinley Paper Co. - Washington MillClallam County, Washington12.6 MW
  9. 9Port Townsend PaperJefferson County, Washington7.5 MW
  10. 10Cedar HillsKing County, Washington5.4 MW

Biomass power plants by county in Washington

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Cowlitz2107.4
Stevens157.9
Grays Harbor233
Skagit128
Spokane126
Clallam112.6
King210
Jefferson17.5
Pierce14.5
Snohomish14.5

Biomass Power Plants in Washington: FAQ

How many biomass power plants are in Washington?
13, with 291 MW of nameplate capacity between them, spread over 10 counties. That is the EIA-860M operating count for 2026-07.
Is there a map of Washington biomass power plants?
Yes — the map above. Each dot is one biomass power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest biomass power plant in Washington?
Nippon Dynawave Packaging Longview WA, at 62 MW. The table is sorted largest first, so the rest follow it.
Is there a biomass power plant near me in Washington?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Washington's biomass power plants?
No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Washington is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?