Headwater Energy power plants
Every generating plant operated by Headwater Energy as of 2026-07: 29 plants, 211 MW of nameplate capacity, across 5 states and 1 energy source.
Operator of record: “Headwater Energy, LLC”.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 29
- Nameplate capacity
- 211 MW
- States
- 5
- CA, CO, NC, SC, TX
- Energy sources
- 1
Headwater Energy plants by energy source
- Solar29 plants · 211 MW
Full list of Headwater Energy power plants
| Longbow Solar, LLCSolar Photovoltaic | Headwater Energy, LLC | Brazoria | 78.1 | 1 | 2022 | Operating |
|---|---|---|---|---|---|---|
| Wilson Solar Farm 3Solar Photovoltaic | Headwater Energy, LLC | Wilson | 10 | 1 | 2017 | Operating |
| Wilson Solar Farm 4Solar Photovoltaic | Headwater Energy, LLC | Wilson | 10 | 1 | 2017 | Operating |
| Wilson Solar Farm 5Solar Photovoltaic | Headwater Energy, LLC | Wilson | 10 | 1 | 2017 | Operating |
| Wilson Solar Farm 6Solar Photovoltaic | Headwater Energy, LLC | Wilson | 10 | 1 | 2017 | Operating |
| Wilson Solar Farm 7Solar Photovoltaic | Headwater Energy, LLC | Wilson | 10 | 1 | 2017 | Operating |
| Jackson Solar FarmSolar Photovoltaic | Headwater Energy, LLC | Wilson | 10 | 1 | 2017 | Operating |
| Ash Mesa Solar, LLCSolar Photovoltaic | Headwater Energy, LLC | Montrose | 7.8 | 1 | 2022 | Operating |
| Railroad FarmSolar Photovoltaic | Headwater Energy, LLC | Robeson | 5 | 1 | 2012 | Operating |
| Watts FarmSolar Photovoltaic | Headwater Energy, LLC | Robeson | 5 | 1 | 2012 | Operating |
| Yanceyville FarmSolar Photovoltaic | Headwater Energy, LLC | Caswell | 5 | 1 | 2013 | Operating |
| Oakboro FarmSolar Photovoltaic | Headwater Energy, LLC | Scotland | 5 | 1 | 2014 | Operating |
| Wilson Solar Farm 2Solar Photovoltaic | Headwater Energy, LLC | Wilson | 5 | 1 | 2017 | Operating |
| Market FarmSolar Photovoltaic | Headwater Energy, LLC | Rockingham | 4.9 | 1 | 2014 | Operating |
| Warrenton FarmSolar Photovoltaic | Headwater Energy, LLC | Warren | 4 | 1 | 2012 | Operating |
| Dixon Dairy Road SolarSolar Photovoltaic | Headwater Energy, LLC | Cleveland | 4 | 1 | 2011 | Operating |
| Wilson Solar Farm 1Solar Photovoltaic | Headwater Energy, LLC | Wilson | 3.4 | 1 | 2017 | Operating |
| Flying GooseSolar Photovoltaic | Headwater Energy, LLC | Kern | 3 | 1 | 2026 | Operating |
| Sunny Cow Solar, LLCSolar Photovoltaic | Headwater Energy, LLC | Kern | 2 | 1 | 2023 | Operating |
| Mule Farm Solar, LLCSolar Photovoltaic | Headwater Energy, LLC | Johnston | 2 | 1 | 2022 | Operating |
| Ramp Solar, LLCSolar Photovoltaic | Headwater Energy, LLC | Wayne | 2 | 1 | 2022 | Operating |
| Hubble Solar, LLCSolar Photovoltaic | Headwater Energy, LLC | Columbus | 2 | 1 | 2023 | Operating |
| Birch Solar (SC)Solar Photovoltaic | Headwater Energy, LLC | Darlington | 2 | 1 | 2024 | Operating |
| Chapman SolarSolar Photovoltaic | Headwater Energy, LLC | Darlington | 2 | 1 | 2023 | Operating |
| Pruger Solar IISolar Photovoltaic | Headwater Energy, LLC | Marion | 2 | 1 | 2026 | Operating |
| Stamey SolarSolar Photovoltaic | Headwater Energy, LLC | Darlington | 2 | 1 | 2023 | Operating |
| Washington Solar (SC)Solar Photovoltaic | Headwater Energy, LLC | Marion | 2 | 1 | 2023 | Operating |
| Thomas SolarSolar Photovoltaic | Headwater Energy, LLC | Lee | 2 | 1 | 2024 | Operating |
| Blue Skies Solar, LLCSolar Photovoltaic | Headwater Energy, LLC | Kern | 1 | 1 | 2021 | Operating |
Headwater Energy: FAQ
- How many power plants does Headwater Energy operate?
- 29 operating plants are listed under “Headwater Energy, LLC” as of 2026-07, totalling 211 MW of nameplate capacity in 5 states.
- Is Headwater Energy the owner of these plants?
- Not necessarily. Each generator has one operator of record. Ownership can sit with a parent, a partnership or a tax-equity structure that is not shown here.
- Why are affiliates listed separately?
- Because each is a separate operator of record. Rolling subsidiaries into a parent would need an ownership map that is not available, so this page does not invent one.