TotalEnergies Renewables USA power plants

Every generating plant EIA-860M files against TotalEnergies Renewables USA for 2026-07: 8 plants, 18 MW of nameplate capacity, across 4 states and 1 energy source.

EIA files this entity as “TotalEnergies Renewables USA LLC”.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
8
Nameplate capacity
18 MW
States
4
CA, CT, MA, MD
Energy sources
1

TotalEnergies Renewables USA plants by energy source

  • Solar8 plants · 18 MW

Full list of TotalEnergies Renewables USA power plants

Power plants operated by TotalEnergies Renewables USA LLC
Parkton LandfillSolar PhotovoltaicTotalEnergies Renewables USA LLCBaltimore4.712025Operating
Thermo Fisher Pleasanton2 technologiesTotalEnergies Renewables USA LLCAlameda2.622025Operating
Riverside Community College2 technologiesTotalEnergies Renewables USA LLCRiverside2.622025Operating
CTGB Manson YouthSolar PhotovoltaicTotalEnergies Renewables USA LLCNew Haven212024Operating
CTGB Maloney and WebsterSolar PhotovoltaicTotalEnergies Renewables USA LLCTolland212025Operating
CTGB OsbornSolar PhotovoltaicTotalEnergies Renewables USA LLCTolland1.812024Operating
Lincoln Public Schools2 technologiesTotalEnergies Renewables USA LLCMiddlesex1.522024Operating
Kern Co Sheriff2 technologiesTotalEnergies Renewables USA LLCKern1.222025Operating

TotalEnergies Renewables USA: FAQ

How many power plants does TotalEnergies Renewables USA operate?
EIA-860M lists 8 operating plants against “TotalEnergies Renewables USA LLC” for 2026-07, totalling 18 MW of nameplate capacity in 4 states.
Is TotalEnergies Renewables USA the owner of these plants?
EIA-860M names one reporting entity per generator. That entity operates the plant on the survey; ownership can sit with a parent, a partnership or a tax-equity structure that the form does not record.
Why are affiliates listed separately?
Because EIA files them separately. Rolling subsidiaries into a parent would need an ownership map EIA-860M does not publish, so this page does not invent one.