Westbound Solar 3 power plants
Every generating plant EIA-860M files against Westbound Solar 3 for 2026-07: 13 plants, 35 MW of nameplate capacity, across 6 states and 1 energy source.
EIA files this entity as “Westbound Solar 3, LLC”.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 13
- Nameplate capacity
- 35 MW
- States
- 6
- AZ, CA, CT, GA, MA, ME
- Energy sources
- 1
Westbound Solar 3 plants by energy source
- Solar13 plants · 35 MW
Full list of Westbound Solar 3 power plants
| Bates College SkowheganSolar Photovoltaic | Westbound Solar 3, LLC | Somerset | 5 | 1 | 2023 | Operating |
| OverlookSolar Photovoltaic | Westbound Solar 3, LLC | Worcester | 4.9 | 1 | 2023 | Operating |
| Gordon ThompsonSolar Photovoltaic | Westbound Solar 3, LLC | Gordon | 3 | 1 | 2022 | Operating |
| Tift BoydSolar Photovoltaic | Westbound Solar 3, LLC | Tift | 2.9 | 1 | 2022 | Operating |
| Bulloch RushingSolar Photovoltaic | Westbound Solar 3, LLC | Bulloch | 2.9 | 1 | 2023 | Operating |
| Niagara Bottling - BloomfieldSolar Photovoltaic | Westbound Solar 3, LLC | Hartford | 2.8 | 1 | 2022 | Operating |
| Amazon GoodyearSolar Photovoltaic | Westbound Solar 3, LLC | Maricopa | 2.4 | 1 | 2023 | Operating |
| Polk Cedartown 2Solar Photovoltaic | Westbound Solar 3, LLC | Polk | 2.4 | 1 | 2023 | Operating |
| Gordon Pine HallSolar Photovoltaic | Westbound Solar 3, LLC | Gordon | 2.4 | 1 | 2023 | Operating |
| Chattooga GoreSolar Photovoltaic | Westbound Solar 3, LLC | Chattooga | 2.4 | 1 | 2023 | Operating |
| Pierce EuniceSolar Photovoltaic | Westbound Solar 3, LLC | Pierce | 1.9 | 1 | 2023 | Operating |
| Sutter Home Winery GIRSolar Photovoltaic | Westbound Solar 3, LLC | Napa | 1.1 | 1 | 2023 | Operating |
| Whitfield CooperSolar Photovoltaic | Westbound Solar 3, LLC | Whitfield | 1.1 | 1 | 2022 | Operating |
Westbound Solar 3: FAQ
- How many power plants does Westbound Solar 3 operate?
- EIA-860M lists 13 operating plants against “Westbound Solar 3, LLC” for 2026-07, totalling 35 MW of nameplate capacity in 6 states.
- Is Westbound Solar 3 the owner of these plants?
- EIA-860M names one reporting entity per generator. That entity operates the plant on the survey; ownership can sit with a parent, a partnership or a tax-equity structure that the form does not record.
- Why are affiliates listed separately?
- Because EIA files them separately. Rolling subsidiaries into a parent would need an ownership map EIA-860M does not publish, so this page does not invent one.