Silver State Solar Power South
Silver State Solar Power South is a 260 MW solar farm in Clark County, Nevada, operated by Silver State Solar Power South, LLC. EIA-860M lists 8 generating units here, inside CAISO. Its units entered service between 2015 and 2016.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 260.1 MW
- 260.1 MW net summer
- Generating units
- 8
- In service
- 2015–2016
- EIA plant ID
- 58644
Where it is
Loading map…
- County
- Clark County, Nevada
- Coordinates
- 35.63, -115.32
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Silver State Solar Power South, LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Every plant Silver State Solar Power South, LLC reports to EIA →
Silver State Solar Power South: FAQ
- Where is Silver State Solar Power South?
- In Clark County, Nevada (NV). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Silver State Solar Power South?
- 260 MW of nameplate capacity across 8 units, as of the EIA-860M release for 2026-07.
- Who owns Silver State Solar Power South?
- EIA-860M names Silver State Solar Power South, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Silver State Solar Power South LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Silver State Solar Power South, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silver State Solar Power South LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Silver State Solar Power South still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.