Silver State Solar Power South
Silver State Solar Power South is a 260 MW solar farm in Clark County, Nevada, operated by Silver State Solar Power South, LLC. It has 8 generating units here, inside CAISO. Its units entered service between 2015 and 2016.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 260.1 MW
- 260.1 MW net summer
- Generating units
- 8
- In service
- 2015–2016
- Plant code
- 58644
Where it is
Loading map…
- County
- Clark County, Nevada
- Coordinates
- 35.63, -115.32
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Silver State Solar Power South, LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Silver State Solar Power South: FAQ
- Where is Silver State Solar Power South?
- In Clark County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Silver State Solar Power South?
- 260 MW of nameplate capacity across 8 units, as of 2026-07.
- Who owns Silver State Solar Power South?
- Silver State Solar Power South, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Silver State Solar Power South LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Silver State Solar Power South, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silver State Solar Power South LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Silver State Solar Power South still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.