Silver State Solar Power South

Silver State Solar Power South is a 260 MW solar farm in Clark County, Nevada, operated by Silver State Solar Power South, LLC. It has 8 generating units here, inside CAISO. Its units entered service between 2015 and 2016.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
260.1 MW
260.1 MW net summer
Generating units
8
In service
2015–2016
Plant code
58644

Where it is

Loading map…
County
Clark County, Nevada
Coordinates
35.63, -115.32
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Silver State Solar Power South, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Silver State Solar Power South: FAQ

Where is Silver State Solar Power South?
In Clark County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Silver State Solar Power South?
260 MW of nameplate capacity across 8 units, as of 2026-07.
Who owns Silver State Solar Power South?
Silver State Solar Power South, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Silver State Solar Power South LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Silver State Solar Power South, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silver State Solar Power South LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Silver State Solar Power South still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.