Gemini Solar Hybrid
Gemini Solar Hybrid is a 1 GW solar farm in Clark County, Nevada, operated by Gemini Solar. It has 2 generating units here. Its units entered service in 2024.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 1,070 MW
- 1,070 MW net summer
- Generating units
- 2
- In service
- 2024
- Plant code
- 63352
Where it is
Loading map…
- County
- Clark County, Nevada
- Coordinates
- 36.4678, -114.806
- Balancing authority
- NEVP
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Gemini Solar
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 690 MW, Battery 380 MW. It is listed here under Solar, the energy source with the most capacity.
Gemini Solar Hybrid: FAQ
- Where is Gemini Solar Hybrid?
- In Clark County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Gemini Solar Hybrid?
- 1 GW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Gemini Solar Hybrid?
- Gemini Solar is the operator of record. That is not always the ultimate owner.
- Is this the same as Gemini Solar Hybrid LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Gemini Solar here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Gemini Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Gemini Solar Hybrid still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.