Escape Solar Plant

Escape Solar Plant is a 285 MW solar farm in Lincoln County, Nevada, operated by Escape Solar LLC. It has 3 generating units here. Its units entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
285 MW
285 MW net summer
Generating units
3
In service
2025
Plant code
67898

Where it is

Loading map…
County
Lincoln County, Nevada
Coordinates
36.8944, -114.0885
Balancing authority
NEVP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Escape Solar LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 185 MW, Battery 100 MW. It is listed here under Solar, the energy source with the most capacity.

Escape Solar Plant: FAQ

Where is Escape Solar Plant?
In Lincoln County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Escape Solar Plant?
285 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Escape Solar Plant?
Escape Solar LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Escape Solar Plant LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Escape Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Escape Solar Plant LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Escape Solar Plant still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.