Arrow Canyon Solar Hybrid

Arrow Canyon Solar Hybrid is a 275 MW solar farm in Clark County, Nevada, operated by Arrow Canyon Solar LLC. It has 2 generating units here. Its units entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
275 MW
275 MW net summer
Generating units
2
In service
2023
Plant code
62248

Where it is

Loading map…
County
Clark County, Nevada
Coordinates
36.4593, -114.8444
Balancing authority
NEVP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Arrow Canyon Solar LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 200 MW, Battery 75 MW. It is listed here under Solar, the energy source with the most capacity.

Arrow Canyon Solar Hybrid: FAQ

Where is Arrow Canyon Solar Hybrid?
In Clark County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Arrow Canyon Solar Hybrid?
275 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Arrow Canyon Solar Hybrid?
Arrow Canyon Solar LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Arrow Canyon Solar Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Arrow Canyon Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Arrow Canyon Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Arrow Canyon Solar Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.