Ft. Churchill PV

Ft. Churchill PV is a 20 MW solar farm in Lyon County, Nevada, operated by Sierra Pacific Power Co. EIA-860M lists 1 generating unit here. Its unit entered service in 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
19.9 MW
19.5 MW net summer
Generating units
1
In service
2015
EIA plant ID
59472

Where it is

Loading map…
County
Lyon County, Nevada
Coordinates
39.1281, -119.14
Balancing authority
NEVP
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
Sierra Pacific Power Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Sierra Pacific Power Co reports to EIA →

Ft. Churchill PV: FAQ

Where is Ft. Churchill PV?
In Lyon County, Nevada (NV). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Ft. Churchill PV?
20 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Ft. Churchill PV?
EIA-860M names Sierra Pacific Power Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Ft. Churchill PV LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Sierra Pacific Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Ft. Churchill PV LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Ft. Churchill PV still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.