Townsite Solar Project Hybrid

Townsite Solar Project Hybrid is a 270 MW solar farm in Clark County, Nevada, operated by Townsite Solar, LLC. EIA-860M lists 2 generating units here. Its units entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
270 MW
250 MW net summer
Generating units
2
In service
2021
EIA plant ID
60654

Where it is

Loading map…
County
Clark County, Nevada
Coordinates
35.9373, -114.884
Balancing authority
WALC
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Townsite Solar, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 180 MW, Battery 90 MW. It is filed here under Solar, the source with the most capacity.

Every plant Townsite Solar, LLC reports to EIA →

Townsite Solar Project Hybrid: FAQ

Where is Townsite Solar Project Hybrid?
In Clark County, Nevada (NV). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Townsite Solar Project Hybrid?
270 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Townsite Solar Project Hybrid?
EIA-860M names Townsite Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Townsite Solar Project Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Townsite Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Townsite Solar Project Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Townsite Solar Project Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.