Dry Lake Solar Energy Center
Dry Lake Solar Energy Center is a 250 MW solar farm in Clark County, Nevada, operated by Nevada Power Co. EIA-860M lists 2 generating units here. Its units entered service in 2024.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 250 MW
- 250 MW net summer
- Generating units
- 2
- In service
- 2024
- EIA plant ID
- 63933
Where it is
Loading map…
- County
- Clark County, Nevada
- Coordinates
- 36.4273, -114.8907
- Balancing authority
- NEVP
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Nevada Power Co
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Solar 150 MW, Battery 100 MW. It is filed here under Solar, the source with the most capacity.
Dry Lake Solar Energy Center: FAQ
- Where is Dry Lake Solar Energy Center?
- In Clark County, Nevada (NV). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Dry Lake Solar Energy Center?
- 250 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Dry Lake Solar Energy Center?
- EIA-860M names Nevada Power Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Dry Lake Solar Energy Center LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Nevada Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Dry Lake Solar Energy Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Dry Lake Solar Energy Center still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.