MDU / NVSS-II

MDU / NVSS-II is a 14 MW solar farm in Nye County, Nevada, operated by Greenbacker Renewable Energy Corporation. It has 1 generating unit here. Its unit entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
13.5 MW
13.5 MW net summer
Generating units
1
In service
2017
Plant code
66983

Where it is

Loading map…
County
Nye County, Nevada
Coordinates
36.2748, -115.9724
Balancing authority
NEVP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Greenbacker Renewable Energy Corporation
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Greenbacker Renewable Energy Corporation →

MDU / NVSS-II: FAQ

Where is MDU / NVSS-II?
In Nye County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is MDU / NVSS-II?
14 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns MDU / NVSS-II?
Greenbacker Renewable Energy Corporation is the operator of record. That is not always the ultimate owner.
Is this the same as MDU / NVSS-II LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Greenbacker Renewable Energy Corporation here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "MDU / NVSS-II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is MDU / NVSS-II still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.