East Blackland Solar Project 1

East Blackland Solar Project 1 is a 144 MW solar farm in Travis County, Texas, operated by Deriva Energy. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
144 MW
144 MW net summer
Generating units
1
In service
2021
Plant code
57659

Where it is

Loading map…
County
Travis County, Texas
Coordinates
30.4214, -97.4614
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Deriva Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Deriva Energy →

East Blackland Solar Project 1: FAQ

Where is East Blackland Solar Project 1?
In Travis County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is East Blackland Solar Project 1?
144 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns East Blackland Solar Project 1?
Deriva Energy is the operator of record. That is not always the ultimate owner.
Is this the same as East Blackland Solar Project 1 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Deriva Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "East Blackland Solar Project 1 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is East Blackland Solar Project 1 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.