Big Star Solar, LLC (Hybrid)

Big Star Solar, LLC (Hybrid) is a 200 MW solar farm in Bastrop County, Texas, operated by RWE Clean Energy. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
200 MW
200 MW net summer
Generating units
1
In service
2025
EIA plant ID
64202

Where it is

Loading map…
County
Bastrop County, Texas
Coordinates
29.8941, -97.2705
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
RWE Clean Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant RWE Clean Energy reports to EIA →

Big Star Solar, LLC (Hybrid): FAQ

Where is Big Star Solar, LLC (Hybrid)?
In Bastrop County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Big Star Solar, LLC (Hybrid)?
200 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Big Star Solar, LLC (Hybrid)?
EIA-860M names RWE Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Big Star Solar, LLC (Hybrid) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — RWE Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Big Star Solar, LLC (Hybrid) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Big Star Solar, LLC (Hybrid) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.