TJX 2021 DG El Paso DC

TJX 2021 DG El Paso DC is a 2 MW solar farm in El Paso County, Texas, operated by SoCore Energy LLC. It has 1 generating unit here. Its unit entered service in 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.5 MW
1.5 MW net summer
Generating units
1
In service
2024
Plant code
67827

Where it is

Loading map…
County
El Paso County, Texas
Coordinates
31.8077, -106.3378
Balancing authority
EPE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
SoCore Energy LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by SoCore Energy LLC →

TJX 2021 DG El Paso DC: FAQ

Where is TJX 2021 DG El Paso DC?
In El Paso County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is TJX 2021 DG El Paso DC?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns TJX 2021 DG El Paso DC?
SoCore Energy LLC is the operator of record. That is not always the ultimate owner.
Is this the same as TJX 2021 DG El Paso DC LLC?
Probably, but the plant data does not say. It records a plant name and an operator — SoCore Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "TJX 2021 DG El Paso DC LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is TJX 2021 DG El Paso DC still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.