TJX 2021 DG El Paso DC

TJX 2021 DG El Paso DC is a 2 MW solar farm in El Paso County, Texas, operated by SoCore Energy LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.5 MW
1.5 MW net summer
Generating units
1
In service
2024
EIA plant ID
67827

Where it is

Loading map…
County
El Paso County, Texas
Coordinates
31.8077, -106.3378
Balancing authority
EPE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
SoCore Energy LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant SoCore Energy LLC reports to EIA →

TJX 2021 DG El Paso DC: FAQ

Where is TJX 2021 DG El Paso DC?
In El Paso County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is TJX 2021 DG El Paso DC?
2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns TJX 2021 DG El Paso DC?
EIA-860M names SoCore Energy LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as TJX 2021 DG El Paso DC LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — SoCore Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "TJX 2021 DG El Paso DC LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is TJX 2021 DG El Paso DC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.