Hydroelectric Power Plants in Louisiana

Every operating hydroelectric power plant in Louisiana on EIA-860M for 2026-07: 1 plants, 8 generating units and 192 MW of nameplate capacity across 1 county, most of it inside MISO.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
1
8 generating units
Nameplate capacity
192 MW
Counties
1
Grid operator
MISO
covers most of these plants

Map of hydroelectric power plants in Louisiana

Every one of the 1 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Hydro · 1

List of hydroelectric power plants in Louisiana

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

hydroelectric power plants in Louisiana
Sidney A Murray Jr HydroelectricConventional HydroelectricFirst National Bank-CommerceConcordia19281990Operating

Largest hydroelectric power plants in Louisiana

  1. 1Sidney A Murray Jr HydroelectricConcordia County, Louisiana192 MW

Hydroelectric power plants by county in Louisiana

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Concordia1192

Hydroelectric Power Plants in Louisiana: FAQ

How many hydroelectric power plants are in Louisiana?
1, with 192 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
Is there a map of Louisiana hydroelectric power plants?
Yes — the map above. Each dot is one hydroelectric power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest hydroelectric power plant in Louisiana?
Sidney A Murray Jr Hydroelectric, at 192 MW. The table is sorted largest first, so the rest follow it.
Is there a hydroelectric power plant near me in Louisiana?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Louisiana's hydroelectric power plants?
Most of them sit inside MISO, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
How current is this, and what is left out?
EIA-860M for 2026-07. Conventional hydroelectric. Pumped storage is counted separately. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.