Natural Gas Power Plants in Alabama
Every operating natural gas power plant in Alabama on EIA-860M for 2026-07: 26 plants, 117 generating units and 20 GW of nameplate capacity across 17 counties.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 26
- 117 generating units
- Nameplate capacity
- 20 GW
- Counties
- 17
- Grid operator
- Mixed
- no single ISO covers a majority
Map of natural gas power plants in Alabama
Every one of the 26 plants is drawn at the coordinate EIA files for it.
Loading map…
- Natural gas · 26
List of natural gas power plants in Alabama
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Barry3 technologies | Alabama Power Co | Mobile | 3,343.5 | 12 | 1954 | Operating |
| E C Gaston3 technologies | Alabama Power Co | Shelby | 2,034 | 6 | 1960 | Operating |
| H Allen Franklin Combined CycleNatural Gas Fired Combined Cycle | Southern Power Co | Lee | 1,995.7 | 9 | 2002 | Operating |
| E B Harris Electric Generating PlantNatural Gas Fired Combined Cycle | Southern Power Co | Autauga | 1,304 | 6 | 2003 | Operating |
| Greene County2 technologies | Alabama Power Co | Greene | 1,288.4 | 11 | 1965 | Operating |
| ColbertNatural Gas Fired Combustion Turbine | Tennessee Valley Authority | Colbert | 1,169.6 | 11 | 1972 | Operating |
| Tenaska Lindsay Hill Generating StationNatural Gas Fired Combined Cycle | Alabama Power Co | Autauga | 939.4 | 4 | 2002 | Operating |
| Central Alabama Generating StationNatural Gas Fired Combined Cycle | Alabama Power Co | Autauga | 927.1 | 4 | 2003 | Operating |
| Decatur Energy CenterNatural Gas Fired Combined Cycle | Decatur Energy Center LLC | Morgan | 902.4 | 4 | 2002 | Operating |
| Morgan Energy CenterNatural Gas Fired Combined Cycle | Morgan Energy Center LLC | Morgan | 900 | 4 | 2003 | Operating |
| Hillabee Energy CenterNatural Gas Fired Combined Cycle | CER Generation LLC | Tallapoosa | 822.8 | 3 | 2010 | Operating |
| Calhoun Energy CenterNatural Gas Fired Combustion Turbine | Alabama Power Co | Calhoun | 748 | 4 | 2003 | Operating |
| Lowman Energy CenterNatural Gas Fired Combined Cycle | PowerSouth Energy Cooperative | Washington | 732.7 | 2 | 2023 | Operating |
| McIntosh (AL)2 technologies | PowerSouth Energy Cooperative | Washington | 676 | 5 | 1991 | Operating |
| McWilliamsNatural Gas Fired Combined Cycle | PowerSouth Energy Cooperative | Covington | 654 | 7 | 1954 | Operating |
| Theodore Cogen FacilityNatural Gas Fired Combined Cycle | Alabama Power Co | Mobile | 317.4 | 2 | 2000 | Operating |
| Hog Bayou Energy CenterNatural Gas Fired Combined Cycle | Mobile Energy LLC | Mobile | 280 | 2 | 2001 | Operating |
| Washington County Cogeneration FacilityNatural Gas Fired Combined Cycle | Alabama Power Co | Washington | 122.5 | 2 | 1999 | Operating |
| International Paper Riverdale Mill3 technologies | International Paper Co-Riverdl | Dallas | 104.2 | 4 | 1967 | Operating |
| Walton Discover Power FacilityNatural Gas Fired Combustion Turbine | Walton Discover LLC | LEE | 103 | 2 | 1999 | Operating |
| AMEA PeakingNatural Gas Fired Combustion Turbine | Alabama Municipal Elec Authority - (AL) | Talladega | 98.6 | 2 | 2004 | Operating |
| General Electric PlasticNatural Gas Fired Combined Cycle | Alabama Power Co | Lowndes | 97 | 2 | 1999 | Operating |
| Kimberly Clark Mobile - CHP PlantNatural Gas Fired Combustion Turbine | Kimberly Clark - Mobile Alabama | Mobile | 50 | 2 | 2019 | Operating |
| Packaging Corp. of America Jackson Mill2 technologies | Boise White Paper LLC | Clarke | 44.4 | 2 | 1996 | Operating |
| W&T Onshore Treating Facility (OTF)Natural Gas Fired Combined Cycle | W&T Offshore Inc | Mobile | 12 | 4 | 1993 | Operating |
| ABC CokeNatural Gas Steam Turbine | ABC Coke - Drummond Co, Inc | Jefferson | 3.8 | 1 | 1997 | Operating |
Largest natural gas power plants in Alabama
- 1BarryMobile County, Alabama3,343.5 MW
- 2E C GastonShelby County, Alabama2,034 MW
- 3H Allen Franklin Combined CycleLee County, Alabama1,995.7 MW
- 4E B Harris Electric Generating PlantAutauga County, Alabama1,304 MW
- 5Greene CountyGreene County, Alabama1,288.4 MW
- 6ColbertColbert County, Alabama1,169.6 MW
- 7Tenaska Lindsay Hill Generating StationAutauga County, Alabama939.4 MW
- 8Central Alabama Generating StationAutauga County, Alabama927.1 MW
- 9Decatur Energy CenterMorgan County, Alabama902.4 MW
- 10Morgan Energy CenterMorgan County, Alabama900 MW
Natural gas power plants by county in Alabama
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Mobile | 5 | 4,002.9 |
| Autauga | 3 | 3,170.5 |
| Shelby | 1 | 2,034 |
| Lee | 1 | 1,995.7 |
| Morgan | 2 | 1,802.4 |
| Washington | 3 | 1,531.2 |
| Greene | 1 | 1,288.4 |
| Colbert | 1 | 1,169.6 |
| Tallapoosa | 1 | 822.8 |
| Calhoun | 1 | 748 |
| Covington | 1 | 654 |
| Dallas | 1 | 104.2 |
| LEE | 1 | 103 |
| Talladega | 1 | 98.6 |
| Lowndes | 1 | 97 |
| Clarke | 1 | 44.4 |
| Jefferson | 1 | 3.8 |
Natural Gas Power Plants in Alabama: FAQ
- How many natural gas power plants are in Alabama?
- 26, with 20 GW of nameplate capacity between them, spread over 17 counties. That is the EIA-860M operating count for 2026-07.
- Is there a map of Alabama natural gas power plants?
- Yes — the map above. Each dot is one natural gas power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest natural gas power plant in Alabama?
- Barry, at 3 GW. The table is sorted largest first, so the rest follow it.
- Is there a natural gas power plant near me in Alabama?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Alabama's natural gas power plants?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Alabama is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Combined cycle, combustion turbine, steam turbine, internal combustion and other gas-fired units. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.