Copper Mountain Solar 3

Copper Mountain Solar 3 is a 255 MW solar farm in Clark County, Nevada, operated by RWE Clean Energy. EIA-860M lists 10 generating units here. Its units entered service between 2014 and 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
255 MW
255 MW net summer
Generating units
10
In service
2014–2015
EIA plant ID
58915

Where it is

Loading map…
County
Clark County, Nevada
Coordinates
35.8894, -114.9579
Balancing authority
LDWP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
RWE Clean Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant RWE Clean Energy reports to EIA →

Copper Mountain Solar 3: FAQ

Where is Copper Mountain Solar 3?
In Clark County, Nevada (NV). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Copper Mountain Solar 3?
255 MW of nameplate capacity across 10 units, as of the EIA-860M release for 2026-07.
Who owns Copper Mountain Solar 3?
EIA-860M names RWE Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Copper Mountain Solar 3 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — RWE Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Copper Mountain Solar 3 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Copper Mountain Solar 3 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.