ABIA Parking Structure

ABIA Parking Structure is a 2 MW solar farm in Travis County, Texas, operated by SoCore Energy LLC. It has 1 generating unit here, inside SPP. Its unit entered service in 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.8 MW
1.8 MW net summer
Generating units
1
In service
2021
Plant code
67791

Where it is

Loading map…
County
Travis County, Texas
Coordinates
30.2047, -97.6686
Balancing authority
SWPP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
SoCore Energy LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by SoCore Energy LLC →

ABIA Parking Structure: FAQ

Where is ABIA Parking Structure?
In Travis County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is ABIA Parking Structure?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns ABIA Parking Structure?
SoCore Energy LLC is the operator of record. That is not always the ultimate owner.
Is this the same as ABIA Parking Structure LLC?
Probably, but the plant data does not say. It records a plant name and an operator — SoCore Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "ABIA Parking Structure LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is ABIA Parking Structure still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.