Hydroelectric Power Plants in North Dakota
Every operating hydroelectric power plant in North Dakota on EIA-860M for 2026-07: 1 plants, 5 generating units and 583 MW of nameplate capacity across 1 county, most of it inside SPP.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 5 generating units
- Nameplate capacity
- 583 MW
- Counties
- 1
- Grid operator
- SPP
- covers most of these plants
Map of hydroelectric power plants in North Dakota
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Hydro · 1
List of hydroelectric power plants in North Dakota
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| GarrisonConventional Hydroelectric | USACE-Omaha | Mercer | 583.4 | 5 | 1956 | Operating |
Largest hydroelectric power plants in North Dakota
- 1GarrisonMercer County, North Dakota583.4 MW
Hydroelectric power plants by county in North Dakota
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Mercer | 1 | 583.4 |
Hydroelectric Power Plants in North Dakota: FAQ
- How many hydroelectric power plants are in North Dakota?
- 1, with 583 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of North Dakota hydroelectric power plants?
- Yes — the map above. Each dot is one hydroelectric power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest hydroelectric power plant in North Dakota?
- Garrison, at 583 MW. The table is sorted largest first, so the rest follow it.
- Is there a hydroelectric power plant near me in North Dakota?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs North Dakota's hydroelectric power plants?
- Most of them sit inside SPP, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Conventional hydroelectric. Pumped storage is counted separately. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.