Solar Farms in Idaho
Every operating solar farm in Idaho on EIA-860M for 2026-07: 14 plants, 15 generating units and 827 MW of nameplate capacity across 5 counties.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 14
- 15 generating units
- Nameplate capacity
- 827 MW
- Counties
- 5
- Grid operator
- Mixed
- no single ISO covers a majority
Map of solar farms in Idaho
Every one of the 14 plants is drawn at the coordinate EIA files for it.
Loading map…
- Solar · 14
List of solar farms in Idaho
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Matrix Pleasant ValleySolar Photovoltaic | Pleasant Valley Solar, LLC | Ada | 200 | 1 | 2025 | Operating |
| Pleasant Valley Solar 2 ProjectSolar Photovoltaic | PVS 2, LLC | Ada | 125 | 1 | 2026 | Operating |
| Jackpot Solar, LLCSolar Photovoltaic | Deriva Energy | Twin Falls | 120 | 1 | 2022 | Operating |
| Franklin Solar HybridSolar Photovoltaic | Franklin Solar Idaho | Twin Falls | 100 | 1 | 2024 | Operating |
| Grand View Solar TwoSolar Photovoltaic | Grand View PV Solar Two, LLC | Elmore | 80 | 2 | 2016 | Operating |
| ID SolarSolar Photovoltaic | AES Distributed Energy | Ada | 40 | 1 | 2016 | Operating |
| Black Mesa Solar, LLCSolar Photovoltaic | Black Mesa Solar, LLC | Elmore | 40 | 1 | 2023 | Operating |
| Mt. Home Solar 1, LLCSolar Photovoltaic | Standard Solar | Elmore | 20 | 1 | 2017 | Operating |
| Murphy Flat SolarSolar Photovoltaic | Murphy Flat Power, LLC | Owyhee | 20 | 1 | 2017 | Operating |
| Orchard Ranch SolarSolar Photovoltaic | Orchard Ranch Solar, LLC | Ada | 20 | 1 | 2017 | Operating |
| American Falls SolarSolar Photovoltaic | American Falls Solar LLC | Power | 20 | 1 | 2017 | Operating |
| American Falls Solar IISolar Photovoltaic | American Falls Solar II, LLC | Power | 20 | 1 | 2017 | Operating |
| Simcoe SolarSolar Photovoltaic | Simcoe Solar | Elmore | 20 | 1 | 2017 | Operating |
| Clif Bar Bakery of Twin FallsSolar Photovoltaic | Mondelez Global LLC (Twin Falls) | Twin Falls | 1.6 | 1 | 2019 | Operating |
Largest solar farms in Idaho
- 1Matrix Pleasant ValleyAda County, Idaho200 MW
- 2Pleasant Valley Solar 2 ProjectAda County, Idaho125 MW
- 3Jackpot Solar, LLCTwin Falls County, Idaho120 MW
- 4Franklin Solar HybridTwin Falls County, Idaho100 MW
- 5Grand View Solar TwoElmore County, Idaho80 MW
- 6ID SolarAda County, Idaho40 MW
- 7Black Mesa Solar, LLCElmore County, Idaho40 MW
- 8Mt. Home Solar 1, LLCElmore County, Idaho20 MW
- 9Murphy Flat SolarOwyhee County, Idaho20 MW
- 10Orchard Ranch SolarAda County, Idaho20 MW
Solar farms by county in Idaho
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Ada | 4 | 385 |
| Twin Falls | 3 | 221.6 |
| Elmore | 4 | 160 |
| Power | 2 | 40 |
| Owyhee | 1 | 20 |
Solar Farms in Idaho: FAQ
- How many solar farms are in Idaho?
- 14, with 827 MW of nameplate capacity between them, spread over 5 counties. That is the EIA-860M operating count for 2026-07.
- Is there a map of Idaho solar farms?
- Yes — the map above. Each dot is one solar farm, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest solar farm in Idaho?
- Matrix Pleasant Valley, at 200 MW. The table is sorted largest first, so the rest follow it.
- Is there a solar farm near me in Idaho?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Idaho's solar farms?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Idaho is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Solar photovoltaic and solar thermal, with and without storage. Utility-scale only: EIA-860M starts at 1 MW, so rooftop solar is not here. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.