Wind Farms in Nevada

Every operating wind farm in Nevada on EIA-860M for 2026-07: 1 plants, 1 turbine strings and 150 MW of nameplate capacity across 1 county.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
1
1 generating units
Nameplate capacity
150 MW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of wind farms in Nevada

Every one of the 1 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Wind · 1

List of wind farms in Nevada

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

wind farms in Nevada
Spring Valley Wind ProjectOnshore Wind TurbinePattern Operators LPWhite Pine15012012Operating

Largest wind farms in Nevada

  1. 1Spring Valley Wind ProjectWhite Pine County, Nevada150 MW

Wind farms by county in Nevada

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
White Pine1150

Wind Farms in Nevada: FAQ

How many wind farms are in Nevada?
1, with 150 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
Is there a map of Nevada wind farms?
Yes — the map above. Each dot is one wind farm, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest wind farm in Nevada?
Spring Valley Wind Project, at 150 MW. The table is sorted largest first, so the rest follow it.
Is there a wind farm near me in Nevada?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Nevada's wind farms?
No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Nevada is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
EIA-860M for 2026-07. Onshore and offshore wind turbines. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.